Kim, a new residential client from Wall Township, New Jersey, needed a clear and accurate site plan to obtain a permit to replace an existing shed with a new one.
The local authority required a detailed layout showing current conditions and the location of the new structure within the property.
Order:
Kim selected our Medium Package Site Plan, requesting delivery in PDF format with standard sizing.
The plan needed to show one new accessory structure (shed) along with all existing site features.
No reference files or sketches were provided, so our team handled the full drafting process from start to finish.
She selected a 24-hour delivery timeframe for the completed plan.
OUR SOLUTION:
Our designers prepared a non-certified site plan accepted by most townships, allowing Kim to proceed without the time and cost of a formal survey.
With no site visit required, we were able to keep the process fast and efficient while maintaining accuracy.
Although Kim selected a 24-hour turnaround, the completed site plan was delivered faster than expected, in just 8 hours.
Kim’s Medium Site Plan drawing incuded all necessary information like:
REVISIONS
Kim requested two revisions, both related to minor placement adjustments.
These updates were completed quickly and at no extra cost.
SUMMARY
This project stands out for its simplicity and speed.
Kim received a complete, permit-ready site plan without needing to provide drawings or site details.
Clear communication and quick revisions helped finalize the plan smoothly, making it easy for her to proceed with the shed replacement permit.