Jayden, a new residential client from Bloomington, Indiana, needed a clear and well-structured site plan for a tree removal permit.
His request was simple but important – remove the tree behind the house while making sure the local authorities could easily understand the property layout and surrounding features.
Order:
Jayden chose our Medium Package Site Plan with a 24-hour turnaround time and requested the final files in PDF and DWG formats.
No custom size or additional options were needed, and there were no new structures planned.
The only reference he provided was a satellite image of the property, which our designers used as a starting point to accurately map the location of the tree and existing elements.
OUR SOLUTION:
Our CAD team prepared a non-certified site plan accepted by most townships, and since no site visit was required, we were able to begin drafting immediately and keep costs lower for the client.
Although Jayden selected a 24-hour delivery window, we completed the plan in just 14 hours.
This provided a clear visual overview needed for a tree removal permit, site plan approval, and residential landscaping compliance.
Jayden’s Medium Site Plan drawing incuded all necessary information like:
REVISIONS
No revisions were requested. The first draft fully matched Jayden’s expectations.
SUMMARY
This project stands out because even with minimal reference material, our team delivered a precise and easy-to-review plan ahead of schedule.
Jayden received exactly what he needed to submit his permit without delays.
The biggest advantage of this collaboration was speed combined with clarity, a strong example of how the right site plan can simplify even small residential improvements.



DELIVERY TIME

FILE TYPE

PAPER SIZE

REVISION
PHONE – CHAT – EMAIL
– OR –
Recent Case Studies See all