Lori, a new residential client from Tucson, Arizona, needed a detailed site plan for a unique agricultural project.
Her scope included the demolition of an existing agricultural building, construction of a new ag structure, and proper documentation for a propane tank permit.
The plan had to clearly show existing and proposed conditions to meet local review requirements.
Order:
Lori selected our Gold Package Site Plan and chose a 12-hour turnaround time.
She requested the final drawings in PDF, JPG, and DWG formats, with standard sizing.
The project included a new structure, along with added details such as topographical lines and a vicinity map.
No reference files or sketches were provided, so our team handled the full drafting process from the ground up.
OUR SOLUTION:
Our CAD designers created a clear, permit-ready site plan that accurately reflected the existing house, proposed agricultural building, and propane tank location.
The plan was prepared as a non-certified site plan commonly accepted by local authorities, which helped streamline the approval process.
With no site visit required, we were able to work efficiently and keep the project moving.
Although Lori selected a 12-hour delivery window, we completed the site plan in just 8 hours.
Lori’s Gold Site Plan drawing incuded all necessary information like:
REVISIONS
Lori requested two revisions, both handled quickly at no additional cost.
The updates ensured every detail aligned with the permit requirements.
SUMMARY
This project stands out for its complexity, combining demolition, new construction, and a propane tank permit in one clear site plan.
By delivering ahead of schedule and staying responsive during revisions, our team helped Lori confidently prepare her submission without delays.
The result was a smooth collaboration and a site plan ready to support her agricultural build.