Case Study / Residential Project

How Norman W. from Davenport, IA
Secured His Site Plan for a Generator Permit

Norman W., a new residential client from Davenport, Iowa, needed a simple and clear site plan to apply for a generator permit.

 The goal was to show the exact placement of the generator in relation to his home and property boundaries, ensuring compliance with local requirements.

How Norman Got Started

Norman selected our Simple Package Site Plan with a 24-hour turnaround and requested the final file in PDF format.

He provided a sketch showing the proposed generator placement, which gave our team a clear starting point for drafting the layout.

Address Only  – No Site Visit Required

⭐⭐⭐⭐⭐

Excellent 4.9/5 based on 947 reviews

Norman W.Great service. Made several changes to my plan with no problems.

How We Drafted Norman’s Generator Permit Site Plan

Using Norman’s sketch and property data, our CAD team created a non-certified site plan commonly accepted by most townships, allowing for a quicker and more cost-effective process.

Since no site visit was required, we were able to move straight into drafting and complete everything efficiently.

Although the selected turnaround time was 24 hours, we delivered the finished plan in just 16 hours.

Everything was delivered cleanly and ready for submission.

Norman’s  Simple Site Plan drawing incuded all necessary information like:

  • Property Lines
  • Primary Structure
  • North Arrow
  • Parcel ID
  • Lot dimensions
  • Scale, Roofline
  • Measurements Between Major Features

REVISIONS

Norman requested one revision, which involved a small adjustment to the generator’s position.

Our team handled it quickly and at no additional cost.

Result: Generator Site Plan Ready in Davenport, Iowa

This project shows how even a simple sketch can be turned into a permit-ready site plan with the right expertise.

Norman appreciated how quickly the plan was completed and how clearly the generator placement was presented.

The key value here was speed combined with accuracy, giving him exactly what he needed without unnecessary complexity.

16h

Delivery Time

PDF

File Type

Accurate and detailed non-certified site plan drafting

8.5x11"

Paper Size

1

Revisions

What Norman said about our plan

⭐⭐⭐⭐⭐

Excellent 4.9/5 based on 947 reviews

Ready to get your Generator permit approved?
See how fast and easy it is.

Join thousands of homeowners & contractors.

Address Only  – No Site Visit Required

– OR –

Please feel free to contact us
if you have any questions about our services

PHONE – CHAT – EMAIL

100% satisfaction guaranteed, 4.9-star Google rating, money back guaranteed

Recent Case Studies     See all

58700 +

Site Plans Delivered

8470 +

5-Star Reviews

50

States Covered

20

Years of Experience

Serving All States

No matter where your property is located, we’ve got you covered

From coast to coast – and from the northern peaks to the southern shores – we’ve successfully completed projects in all states.

Back to top
805 416 0026