A plot plan is a scaled drawing of a property showing its boundaries, existing buildings, proposed improvements, and distances between important features. Homeowners use plot plans for building permits, zoning reviews, and homeowners association (HOA) applications.
You may need one when constructing a garage, installing a swimming pool, adding a deck, or making other changes to your property. The exact requirements depend on your local building department and the project.
At Get a Site Plan, we prepare non-certified plot plans for residential and commercial properties. These drawings are suitable for many permit applications, although some jurisdictions require plans prepared or certified by licensed professionals.
Table of Contents
ToggleWhat Is a Plot Plan?

A plot plan is a bird’s-eye-view drawing that shows how buildings and other features are positioned within a parcel of land.
It identifies property lines, building footprints, setbacks, driveways, and proposed construction. The drawing allows homeowners, contractors, and local authorities to understand how a project fits within the property’s boundaries.
For example, if you’re building a 12-by-16-foot shed, a plot plan can show its proposed location, dimensions, and distance from neighboring property lines.
Plot plans and site plans are often used interchangeably. Some jurisdictions distinguish between them based on the amount of information required, but there is no universal difference that applies everywhere.
When Do You Need a Plot Plan?

A plot plan is commonly required when a project changes how a property is developed or used.
Typical projects include:
- Building a new house or adding a room.
- Constructing a garage, carport, or accessory dwelling unit (ADU).
- Installing a swimming pool or deck.
- Building a shed, fence, or retaining wall.
- Expanding or relocating a driveway.
- Applying for zoning approval or certain land-use changes.
A plot plan may also be necessary for building permit applications or HOA approval.
Requirements vary considerably. For example, Portland, Oregon, requires a site plan with residential building permit applications, including projects involving interior work.
Check with your local building department before preparing the drawing. Some minor improvements are exempt from permits, while larger projects may require additional engineering, drainage, or grading documents.
What Does a Plot Plan Include?

A plot plan must contain enough information for reviewers to understand existing conditions and proposed changes.
The following components are commonly included:
| Component | What It Shows |
|---|---|
| Property information | Street address, parcel identification, and lot dimensions |
| Property boundaries | Parcel outline and property-line measurements |
| Existing structures | House, garage, shed, and other buildings |
| Proposed improvements | Location and dimensions of new construction |
| Setbacks | Distances between structures and property lines |
| Access and infrastructure | Driveways, streets, easements, and relevant utilities |
| Orientation and scale | North arrow, drawing scale, and applicable labels |
| Site conditions | Trees, slopes, drainage, and elevations when required |
The requirements depend on the jurisdiction.
For example, the Fairbanks North Star Borough’s residential checklist specifies property dimensions, existing and proposed structures, setbacks, roads, driveways, scale, and a north arrow. Its guidance also identifies additional details that may be required for particular projects.
More complicated properties may need considerably more information, especially when construction affects drainage, environmentally protected areas, or steep terrain.

Understanding Plot Plan Scale
Plot plans use a consistent drawing scale so that structures and distances remain proportional.
Common examples include:
- 1 inch = 10 feet: Often useful for detailed residential drawings.
- 1 inch = 20 feet: Suitable for showing a larger residential lot on a single sheet.
- 1 inch = 40 feet: Sometimes used for larger properties.
These are examples, not universal requirements.
Portland’s residential site plan guidelines specify a scale of 1 inch = 10 feet or larger and a minimum sheet size of 11 by 17 inches.
Always follow the standards of the authority reviewing your application.
Plot Plan vs. Land Survey: What’s the Difference?
A plot plan and a land survey serve different purposes.
A plot plan illustrates the arrangement of structures and property features. A land survey establishes or documents boundary locations through professional surveying methods and applicable records.
A non-certified plot plan may use approximate boundary information obtained from property records, GIS databases, and aerial imagery.
These sources are useful for drafting but cannot reliably establish legal boundary positions.
The Sacramento County Assessor explicitly warns that assessor parcel maps are not surveys and should not be used to resolve boundary disputes.
If you need to determine an exact property line, resolve an encroachment, or satisfy a survey requirement, consult a licensed land surveyor.
How to Create a Plot Plan in 6 Steps

You can create a plot plan yourself or hire a professional drafting service. The following steps apply to most basic residential projects.
Step 1: Check Local Requirements
Contact your building or planning department to confirm which documents your project requires.
Ask whether the department accepts a homeowner-prepared drawing, requires a specific scale, or needs a certified survey.
Getting these answers first helps avoid preparing a drawing that cannot be accepted.
Step 2: Gather Property Information
Find your property’s existing records.
Useful documents include:
- Property deed and legal description.
- Existing boundary survey or subdivision plat.
- Previous plot plans or permit drawings.
- County parcel records and GIS maps.
- Relevant easement or utility documents.
County assessors, recorders, and building departments may have useful information.
Check the dates on existing documents, particularly if your property has undergone construction or subdivision.
Step 3: Draw the Property Boundaries
Start by drawing the lot outline using the available dimensions.
Choose a scale appropriate for your property and the reviewing authority’s requirements. Add the north arrow, street name, and property address.
If your source provides approximate GIS boundaries, identify their limitations. Never present estimated lines as surveyed boundaries.
Step 4: Add Existing Buildings and Features

Draw the footprints of existing structures, including the main house, garage, and accessory buildings.
Add driveways, walkways, patios, fences, and other features relevant to your project.
Label the structures and include their dimensions. Show their distances from property lines where required.
Step 5: Add Proposed Construction and Setbacks

Mark the new structure or improvement clearly, including its dimensions and proposed location.
For example, a detached garage measuring 20 by 24 feet should show its footprint and distances from applicable property boundaries.
Check local setback requirements before choosing its location. Easements and other land-use restrictions may also limit where construction can occur.
Step 6: Review and Submit the Drawing
Check that all dimensions, labels, and proposed changes are readable and consistent.
Confirm that you have included the details requested by the building department. Export or print the drawing in the required format.
Submit it with your permit application and respond to any requested corrections.


How Much Does a Plot Plan Cost in 2026?

The cost depends on how the drawing is prepared, the property’s complexity, and whether professional certification is required.
| Method | Cost |
|---|---|
| Draw it yourself | Potentially free, excluding software or printing expenses |
| Online drafting service | From $89 at Get a Site Plan |
| Licensed land surveyor | Individually quoted based on scope and location |
At Get a Site Plan, our current site plan packages start at $89 for a basic non-certified drawing. More detailed packages range from $119 to $259.
We use available GIS information, satellite imagery, property records, and customer-provided measurements to prepare drawings remotely.
Our standard delivery is typically within 6–24 hours, depending on the selected service.
Our plans do not replace certified surveys, and local authorities determine which drawings they will accept.
FAQs
Yes. Many jurisdictions accept homeowner-prepared plot plans when they meet local requirements. A basic drawing can be created by hand or using drafting software.
Satellite imagery can help you identify buildings and visible features. However, a map screenshot generally lacks the verified dimensions, labels, and other information needed for a permit drawing. It also cannot establish legal boundaries.
Sometimes. Basic plot plans may show only structures and horizontal distances. Projects involving drainage, grading, or uneven terrain may require contour lines, spot elevations, or additional topographic information.
Check your property purchase documents, previous permit applications, county records, or local building department. An existing survey or subdivision plat may also provide a useful starting point.
Yes, but changes affecting the approved project may require a revised drawing and another review. Contact your permitting authority before making substantial changes.



