Case Study / Residential Project

How Evelyn from Baltimore, Maryland Got Her
Site Plan Approved for an ADU Demolition

Evelyn, a first-time client from Baltimore, Maryland, reached out to us for a site plan to obtain a demolition permit for an accessory dwelling unit (ADU) on her residential property.

The structure, measuring 10 x 29.5 ft, was located 13 ft from her primary house and 18 ft and 3 ft from the property lines.

Her project required a detailed site plan outlining key property features to meet local regulations.

THE CHALLENGE

As a new client, Evelyn faced the following challenges:

  1. Submitting a precise site plan to ensure her demolition permit was approved without delays.
  2. Accurately depicting critical property details, such as measurements, property lines, and the structure’s position, while adhering to local regulations.

To streamline the process, she needed a professional and efficient partner capable of delivering a flawless site plan promptly.

Order

She opted for our Medium Site Plan, which included the following features:

  • Property Lines
  • Primary Structure
  • North Arrow and Parcel ID
  • Lot Dimensions
  • Roofline & Scale
  • Swimming Pool
  • Topographical Lines
  • Driveway
  • Fence & Trees
  • Measurements Between Major Features
  • Accessory Structures

Evelyn provided a detailed hand-drawn sketch of her property, showcasing all essential elements.

With the standard 24-hour delivery selected, our team immediately began crafting the site plan.

She needed it delivered only in PDF format.

OUR SOLUTION

Using advanced GIS tools and CAD software, we developed a comprehensive non-certified site plan that highlighted:

  • The exact dimensions and location of the ADU to be demolished.
  • Accurate measurements between the ADU, the primary house, and property lines.
  • A precise layout that adhered to Baltimore’s demolition permit requirements.

 No Site Visit Required: This ensured a faster, more efficient process while maintaining high accuracy.

The plan was delivered in PDF format as per Evelyn’s request, meeting all her  specifications within the promised 24-hour timeframe.

REVISIONS

She requested two revisions to refine the details of the measurements and layout.

Both adjustments were handled promptly completely free of charge, ensuring the final plan perfectly matched her requirements.

THE RESULTS

The final site plan was approved on the first submission, enabling Evelyn to secure her demolition permit without delays.

Our precise and timely work allowed her to move forward with her project seamlessly.

SUMMARY

This case study showcases our ability to deliver accurate and compliant site plans for residential projects under tight deadlines.

Evelyn’s successful experience highlights our commitment to efficient, detail-oriented service, even for first-time clients.

24h

DELIVERY TIME

PDF

FILE TYPE

11x17"

PAPER SIZE

2

REVISIONS

What Evelyn said about our plan

Ready to make your project a success?

Explore our packages today and find the perfect fit for your needs!

Recent Case Studies     See all

Back to top
805 416 0026