Case Study / Residential Project

How Graham from Abington, Pennsylvania
Secured His Site Plan for a Pool & Driveway Upgrade

Graham, a new client from Abington, Pennsylvania, contacted us to prepare a detailed site plan for his residential project.

He needed the site plan to apply for two permits through Abington Township: one for a pool installation and another for redoing and expanding his shared driveway with new asphalt.

The project required a precise layout to ensure compliance with local regulations, and specific measurements for Graham’s shared driveway and private wooden fences.

THE CHALLENGE

As a first-time customer, Graham faced several challenges:

  1. Compliance Requirements: The township required detailed information, including topographical maps, vicinity maps, and flood data.
  2. Shared Property: The shared driveway and garage needed accurate documentation to avoid issues with neighbors.

Without a previous site plan to reference, Graham needed a partner who could deliver a 100% guaranteed-compliant plan quickly and accurately.

Order

Graham chose our Premium Site Plan, which included our Medium Site plan plus:

  • Landscape design
  • Paths and shrubs
  • Lawn layout
  • Well and septic system details
  • Measurements between major features
  • Parking spaces

In addition, Graham requested the following advanced features:

  • Topographical map
  • Vicinity map
  • Flood map
  • Corner elevations

He provided clear photos and measurements of the pool, driveway, and wooden fences, ensuring we had everything we needed to proceed.

The site plan was to be delivered in PDF and DWG formats, with no custom sizing required, within 24 hours.

OUR SOLUTION

Our team quickly got to work, utilizing advanced GIS tools and CAD software to create a detailed, compliant site plan.

Key highlights included:

  • Accurately marking the pool’s dimensions and location relative to Graham’s home.
  • Highlighting the driveway expansion and new asphalt placement, ensuring the shared property boundaries were respected.
  • Adding requested topographical and flood maps to meet township regulations.
  • Detailing the wooden fences as reference points to avoid future disputes.

The entire process was completed remotely, and no site visit was required, saving time and costs for Graham

REVISIONS

This project was completed in one iteration, with no revisions requested, demonstrating our precision and commitment to meeting client expectations from the start.

THE RESULTS

The finalized site plan met all township requirements and was approved without delays, allowing Graham to move forward confidently with his pool and driveway upgrades.

By choosing our Premium Package, Graham ensured a seamless and stress-free permitting process.

SUMMARY

This case study showcases how our team transformed Graham’s vision into a fully compliant site plan, meeting tight deadlines without compromise.

Our collaborative approach, attention to detail, and ability to deliver advanced features made the process smooth and efficient.

24h

DELIVERY TIME

PDF, DWG

FILE TYPE

11x17"

PAPER SIZE

0

REVISIONS

What Graham said about our plan

Ready to make your project a success?

Explore our packages today and find the perfect fit for your needs!

Recent Case Studies     See all

Back to top
805 416 0026