(805) 416 0026 | (805) 727 7289

Blog

SWIMMING POOL PERMIT

What is Swimming pool permit?

If you’re looking to build a swimming pool on the property you will, of course, be needing a permit to do so. There are two ways to get the said permit. The first, and most popular, option is to obtain a Combination Swimming Pool Permit. This Combination permit covers the construction of the swimming pool as well as the electrical, plumbing, and mechanical work directly related to the construction of the swimming pool. The second one is to basically get building, electrical, plumbing, and mechanical permits, separately, for the work covered by each of these permits. The only difference between the two is that the Combination Swimming Pool Permit reduces the amount of paperwork.

New House exterior design showing tropical pool villa with greenery garden

Why do I need this permit?

The reason why this permit is needed is to ensure the safety of its owners. If the pool is regulated and follows all requirements it will be safe for use. A pool permit is required for all swimming pools, spas and safety barriers (including barriers for above ground pools).

How can WE help you?

In order to build a pool you will need a swimming pool permit alongside a building permit. We can provide you with the building permit on our website. We can accurately draw your parcel and provide you with a site plan that will be satisfactory to receiving the building permit.

What is the first step?

First step is to provide us with the address of the property. You can do that by placing an order for one of the packages here or send us a quote with any questions here. We will do our best to help you and recommend you the most suitable package for your needs or give you a Custom Hourly Quote if your needs are not in the scope of work for our packages. You will get a quote from our most skilled designers.

Once we get all the information needed we will start working on your project. The usual turnaround time for the site plan is within 24 hours. We are also able to make a RUSH plan within 12 hours and 6 hours. If needed we will make your project prioritized.

We are here to make your request into mutual successes.

Get A Site Plan team

Tags: Simple Package Site Plan, Medium Package Site Plan, Premium Package Site Plan, Gold Package Site Plan, How we work, Get A Quote from our Team, Explore our Site Plan packages, Contact us here.

Back to top